View of the Field House from the 50-yardline. (07/06/2012) - The exterior brickwork has been completed.
View of the Field House from the home stands. (07/06/2012) - The exterior brickwork has been completed and the decorative wall is being constructed.
View of the Field House from the rear of the King Center. (07/06/2012) - The exterior brickwork has been completed.
View of the southeast side of the Field House. (07/06/2012) - The privacy wall at the door of the locker room is being constructed.
View of the decorative wall in the end zone. (07/06/2012)
View of the Field House from the main entrance (07/06/2012) - The exterior brickwork has been completed.
View of the interior lobby (07/06/2012) - The gridwork for the ceiling has been installed.
View of the laundry room (07/06/2012) - The concrete pad for the washers and dryers has been poured
View of the main locker room (07/06/2012) - The bases of the lockers are being installed in the floor.
View of the upstairs main corridor (07/06/2012) - Lights are being installed in the ceiling gridwork.
View of the team meeting room (07/06/2012) - Lights are being installed in the ceiling gridwork.
View of the coaches' meeting room (07/06/2012) - Lights are being installed in the ceiling gridwork.
View of the main office suite (07/06/2012) - Lights are being installed in the ceiling gridwork.
View of one of the large office spaces (07/06/2012) - Lights are being installed in the ceiling gridwork.
View of the alumni lounge (07/06/2012) - The gridwork for the ceiling has been installed.
View of the new parking areas from the southeast corner of the field house. (07/06/2012) - These parking spaces will serve as the reserved tailgating sections.
View of the new parking areas from the southeast corner of the field house. (07/06/2012) - These parking spaces will serve as the reserved tailgating sections.
View of the new parking areas from the home stands. (07/06/2012) - These parking spaces will serve as the reserved tailgating sections.
View of the new parking areas from the home stands. (07/06/2012) - These parking spaces will serve as the reserved tailgating sections.
View of the Field House from the 50-yardline. (07/13/2012) - The knee wall enclosing the field is being finished.
View of the Field House from the home stands. (07/13/2012) - The knee wall enclosing the field is being finished.
View of the Field House from end zone. (07/13/2012) - The knee wall enclosing the field is being finished.
View of the Field House from the rear of the King Center. (07/13/2012) - The knee wall enclosing the field is being finished.
View of the Field House from the main entrance (07/13/2012) - The front door has been hung some retaining walls are being constructed.
View of the equipment room (07/13/2012) - The ventilation ducts have now been completed.
View of the laundry room (07/13/2012) - The washers and driers have arrived on site and are waiting to be installed.
View of the main locker room (07/13/2012) - The bases of the lockers have been poured.
View of the second floor men's bathroom (07/13/2012)
View of the new parking areas from the home stands. (07/13/2012) - These parking spaces will serve as the reserved tailgating sections.
View of the new parking areas from the home stands. (07/13/2012) - These parking spaces will serve as the reserved tailgating sections.
View of the new parking areas from the home stands. (07/13/2012) - These parking spaces will serve as the reserved tailgating sections.
View of the new parking areas from the home stands. (07/13/2012) - These parking spaces will serve as the reserved tailgating sections.
View of the Field House from the 50-yardline. (07/20/2012) - The poles for the field goal net have been installed and the Fred Selfe Rock has been put in place.
View of the Field House from the home stands. (07/20/2012) - The poles for the field goal net have been installed and the Fred Selfe Rock has been put in place.
View of the Field House from the main entrance (07/20/2012) - The retaining walls are being constructed.
View of the Field House from end zone. (07/20/2012) - The knee wall enclosing the field is being finished.
View of the Field House from the field side. (07/20/2012) - The Fred Selfe Rock has been installed as have the poles for the field goal net.
View of Fred Selfe Stadium from the Field House. (07/20/2012)
View of the second story porch. (07/20/2012) - The concrete pavers are being installed.
One of the washing machines ready to be installed. (07/20/2012)
View of the alumni lounge (07/20/2012) - The floor surface is being prepped.
View of the president's lounge (07/20/2012) - The subfloor has been installed.
View of the new parking areas from the home stands. (07/20/2012) - These parking spaces will serve as the reserved tailgating sections.
View of the new parking areas from the home stands. (07/20/2012) - These parking spaces will serve as the reserved tailgating sections.
View of the new parking areas from the home stands. (07/20/2012) - These parking spaces will serve as the reserved tailgating sections.
View of the Field House from the 50 yardline. (07/30/2012) - The area between the playing surface and the Field House is being prepped for FieldTurf.
View of the Field House from the home stands. (07/30/2012) - The area between the playing surface and the Field House is being prepped for FieldTurf.
View of the Field House from the east endzone. (07/30/2012) - The area between the playing surface and the Field House is being prepped for FieldTurf.
View of the Field House from the rear of the King Center. (07/30/2012) - The knee wall enclosing the field is being finished.
View of the main locker room (07/30/2012) - The light fixtures have been installed and are now operational.
View of the Fred Selfe Rock and King Center from the Field House. (07/30/2012) - The area between the playing surface and the Field House is being prepped for FieldTurf.
View of Fred Selfe Stadium from the Field House. (07/30/2012) - The area between the playing surface and the Field House is being prepped for FieldTurf.
View of the new parking areas from the home stands. (07/30/2012) - These parking spaces will serve as the reserved tailgating sections.
View of the new parking areas from the home stands. (07/30/2012) - These parking spaces will serve as the reserved tailgating sections.